Wind Farms Harveston Wind Farms, Philippine

Max Raise
$70,000.00
Min Invest
$3500
Raised so far
$32900

In stock

Category: Tag:
Max Investment
TooltipAdjust the proposed purchase price to see impact on the financial metrics.
Down Payment
TooltipThe down payment is the cash portion of the property price at the time of purchase when using leverage, or full purchase price when buy all cash. This amount is used to calculate your initial investment, and projected returns.
Estimated Profit
TooltipRent range is an estimate based on publicly available data and is not a prediction or guaranty of future rental income
Total Return
TooltipTotal Return is your cash profit calculated as the sum of your estimated (i) annual net operating cash flows over 10 years, plus (ii) property net sale proceeds minus your initial investment and outstanding loan balance.
$20475
Annualized Return
TooltipAnnualized Return, also known as Internal Rate of Return, is a measure of annualized net return on an equity investment. It equals the discount rate at which the sum of the present value of all cash flows is zero. Calculation is based on actual and budgeted values.
5.2%
Cap Rate
TooltipCap rate is the percentage return calculated by dividing net operating income in Year 1 by the property purchase price. Your net operating cash flow excludes your loan costs. For more details about the net operating income see the Financials tab.
6.2%
Gross Yield
TooltipGross yield is the annual income generated by an asset before any expenses, divided by its purchase price. Monthly rent x 12 months, divided by purchase price.
7.1%
Cash Flow
TooltipFirst year net cash flow is the estimated dollar amount received after payment for property taxes, property management, reserves for R&M, capital expenditures, and loan payments. Assuming 5% vacancy and loan payments based on the lending assumptions selected. For more details see the Financial tab.
$1701
Appreciation
TooltipThe home price appreciation forecast is using either one of the metrics below to estimate property value for the first 5 years, then drops to 3% for the remainder of the holding period. 10Y Hist: Historical annual appreciation percentage increase over a 10 year time horizon based on monthly home appreciation data from CoreLogic. 5Y Hist: Historical annual appreciation percentage increase over a 5 year time horizon based on monthly home appreciation data from CoreLogic. 1Y Hist: Historical annual appreciation percentage increase over a 1 year time horizon based on monthly home appreciation data from CoreLogic.

Description

The 150 MW Burgos Wind Farm is the largest wind power project in Southeast Asia and is located within a 600-hectare site. The facility consists of 50 wind turbines, each with a capacity of 3 MW,  generating electricity to the Luzon Grid.  The project also included a substation and a 43 kilometre long 115 kV transmission line.
The first phase of the project consisted of 29 wind turbines and additional infrastructure; the second phase included another 21 turbines. The project required exceptional coordination as the second phase was started before the end of the first phase, and they were commissioned at the same time.

Additional information

Area

type

City

Location

Reviews

There are no reviews yet.

Be the first to review “Wind Farms Harveston Wind Farms, Philippine”

Your email address will not be published. Required fields are marked *